Appendix 1 — Quality Objectives
Parent procedure: 02 – Quality Policy
Purpose
To document the laboratory's quality objectives, track progress toward each objective, and record the outcomes of periodic reviews.
Instructions
- The Quality Manager establishes quality objectives in consultation with the Technical Manager and Laboratory Director, as described in Procedure 02, section 6.5.
- Each objective should be specific, measurable, achievable, relevant, and time-bound.
- Update the "Current value / status" column periodically (e.g., quarterly) to track progress.
- Review all objectives during the management review (at least annually). Record the outcome in the "Review outcome" column.
- When an objective is achieved, either set a new target or replace it with a new objective that drives further improvement.
:::tip Adapt this template Add or remove columns to suit your laboratory's needs. Some laboratories include a "Data source" column to specify where the measurement data comes from (e.g., LIMS report, training records, audit log). Others track objectives by department or functional area. :::
Quality Objectives Register
Review period: [Enter year or period, e.g., 2026]
| # | Quality objective | Related policy commitment | Indicator / metric | Target | Current value / status | Responsible | Target date | Review outcome |
|---|---|---|---|---|---|---|---|---|
| 1 | [e.g., Achieve satisfactory results in ≥ 90 % of proficiency testing rounds] | Competence, good professional practice | % satisfactory PT results | ≥ 90 % | Technical Manager | [Date] | ||
| 2 | [e.g., Complete all scheduled internal audits within the annual program] | Continual improvement, compliance | % audits completed on schedule | 100 % | Quality Manager | [Date] | ||
| 3 | [e.g., Resolve all customer complaints within 15 working days] | Good professional practice | Average resolution time (days) | ≤ 15 days | Quality Manager | [Date] | ||
| 4 | [e.g., Ensure all personnel complete assigned training on time] | Competence | % training completed by due date | ≥ 95 % | Quality Manager | [Date] | ||
| 5 | [e.g., Reduce routine report turnaround time] | Good professional practice | Average turnaround time (days) | ≤ [X] days | Technical Manager | [Date] | ||
| 6 | [e.g., Maintain equipment calibration compliance] | Competence, compliance | % equipment with current calibration | ≥ 98 % | Technical Manager | [Date] |
Review record
| Review date | Reviewed by | Summary of findings | Actions arising |
|---|---|---|---|
| [Date] | [Name, role] | [e.g., 4 of 6 objectives met; PT performance below target in Q2 — root cause identified] | [e.g., Additional PT round scheduled; training on method X planned] |
| [Date] | [Name, role] |
Objectives established by: [Name, role] Date: [Date] Approved by: [Name, role]